Setting up the Heavy Duty module

From X10Wiki
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Question

How do I install the Heavy Duty module?

Answer

1. Use a small screwdriver to set the red Housecode dial on the Heavy Duty (220V) Module to the same letter as your X-IO Controller(s).

2. Set the black Unit Code dial to any number between 1 and 16.

3. Plug your appliance into the Module and plug the Module into a standard 220V AC wall outlet which is supplied from a regular 110/220V or 120/240V split phase wiring system (as found in most houses).


The Heavy Duty 220V Modules do NOT work on 3 phase wiring systems as sometimes found in apartment buildings.


Additional Information

The HD243 can control any 220/240V appliance rated up to 15A.

The HD245 can control any 220/240V appliance rated up to 20A.

The Heavy Duty Module is compatible with all X-10 Controllers and Timers.