Setting up the Heavy Duty module

From X10Wiki

Question

How do I install the Heavy Duty module?

Answer

1. Use a small screwdriver to set the red Housecode dial on the Heavy Duty (220V) Module to the same letter as your X-IO Controller(s).

2. Set the black Unit Code dial to any number between 1 and 16.

3. Plug your appliance into the Module and plug the Module into a standard 220V AC wall outlet which is supplied from a regular 110/220V or 120/240V split phase wiring system (as found in most houses). The Heavy Duty 220V Modules do NOT work on 3 phase wiring systems as sometimes found in apartment buildings.

Additional Information

The HD243 can control any 220/240V appliance rated up to 15A.

The HD245 can control any 220/240V appliance rated up to 20A.

The Heavy Duty Module is compatible with all X-10 Controllers and Timers.

Personal tools
X10.com | About X10 | Careers at X10 | Privacy Policy | Affiliate Program
ActiveHomePro.com | X10VideoSender.com | iPartyMini.com | X10Wiredhome.com
X10WirelessHome.com | Google Video Remote Control | Google Pack Remote Control
X10 Contractor Program | X10 Security Systems | New! X10 iconRemote
© Copyright 2007 X10.com
iAll rights reserved.